Installed PV: 2.64 MW Power Generation in 25 Years: 64.79million KWh Coal Reduction: 19481.03T Emission Reduction: 53383.33T
Installed PV:4.22 MW Power Generation in 25 Years: 95.12 million KWh Coal Reduction: 28602.73T Emission Reduction: 78377.89T
Installed PV: 12.47 MW Power Generation in 25 Years: 252.52 million KWh Coal Reduction: 75932.01T Emission Reduction: 208074.42T
Installed PV: 37.82 MW Power Generation in 25 Years: 714.51 million KWh Coal Reduction: 214863.28T Emission Reduction: 588786.37T
Installed PV: 50 MW Power Generation in 25 Years: 989.54 million KWh Coal Reduction: 297554.75T Emission Reduction: 815381.25T
Installed PV: 53.07 MW Power Generation in 25 Years: 901.46 million KWh Coal Reduction: 271069.31T Emission Reduction: 742803.82T
Installed PV: 140.53 MW General Contractor: ▪ Power Construction Corporation of China Abu Dhabi Branch ▪ Engineering Corporation International Middle East FZE (HDEC) Location: Al Ajban Area, Abu Dhabi, UAE Work Content: Ground PV Support & Module Installation
Installed PV: 400 KW Power Generation in 25 Years: 8.89million KWh Coal Reduction: 2740T Emission Reduction: 7508T